Results 1 to 8 of 8

Thread: FabLab Tulsa, new ShopBot

  1. #1
    Join Date
    Mar 2008
    Location
    Tulsa Oklahoma
    Posts
    1,238

    Smile FabLab Tulsa, new ShopBot

    The Tulsa FabLab (http://www.fablabtulsa.com) is coming together now, construction on the building is done and now its time to start assembling tools. I was asked for assistance, and thought I would post a few pictures of the progress.

    Facilities are really looking nice, this place is conceived as a meeting place to facilitate innovation. Bringing creative people together from different backgrounds and perspectives should make lively discussions and rapid design evolution. On their website they list the tools that will be in place when they open to the public.

    The bot is a PRSalpha 48x96 3 axis with a 4hp spindle.

    As of yesterday evening, all of the preliminary assembly is done. Next step is to get the electrician in to bring in the circuits necessary to power it. Then we can start preliminary setup and squaring. I intend to do squaring on a couple sheets of Lowes blue foam (LBF), with one sheet acting as a spoilboard, and the other as the working material. Initial hold-down will be double sided tape!

    Once the basic XY squaring is finished we will use the bot to make its own initial baseboard and spoilboard. Again using the LBF as a temporary expendable base.

    The excitement from the staff is wonderful. As I can I will post more photos, and update the progress. For information about the lab and when it will be open to the public, keep an eye on their web site.

    Note, I am an interested observer, so I can only answer the most basic questions.

    Stay tuned- D
    Attached Images Attached Images
    "The best thing about building something new is either you succeed or learn something. Its a win-win situation."

    --Greg Westbrook

  2. #2
    Join Date
    Nov 2009
    Posts
    727

    Default

    Its nice seeing the vision of digital fabrication outside of industry become reality. While its a concept we are all aware of most people just aren't aware of how "casual" it can be.
    Michael Schwartz - Waitsfield VT
    Shopbot prs standard 48x96. Aspire. SB Link.

  3. #3
    Join Date
    Feb 2007
    Location
    Highland, IL
    Posts
    80

    Default

    Dana,

    If you need assistance send me a private message. I would be interested in helping. My hours are limited, but I can usually find some time each week.


    Jay

  4. #4
    Join Date
    Mar 2006
    Posts
    7,832

    Default

    I hope they appreciate having their own in house expert
    I know you must enjoy this project.

  5. #5
    Join Date
    Mar 2008
    Location
    Tulsa Oklahoma
    Posts
    1,238

    Default

    Update-

    Finally got electricity run to the bot, so now with power on we have squared the table (Dial indicator photo), built the three layers of the spoilboard, glued the spoilboard layers together, and surfaced the spoilboard.

    Hold down is using bolts to the C rails, or a 6"x6" grid of holes with embedded 1/4x20 TNuts. That should provide mounting for most projects. The top two layers are designed to be easily replaced, they bolt on from underneath.

    Its been an interesting build, and some of the issues others have experienced and posted to the forum have happened. Comm issues, backlash problems, prox switch issues, etc. I thank everybody for their contributions, they have helped a lot in getting this machine online.

    When the lab opens and projects start getting built I plan to post some photos of what is getting built on it.
    Attached Images Attached Images
    "The best thing about building something new is either you succeed or learn something. Its a win-win situation."

    --Greg Westbrook

  6. #6
    Join Date
    Feb 2010
    Location
    SOUTH CENTRAL COLORADO
    Posts
    1,155

    Default too clean

    needs dust

  7. #7
    Join Date
    Mar 2008
    Location
    Tulsa Oklahoma
    Posts
    1,238

    Default

    Rick- that is its "Dustiny".

    Actually it got a lot of dust cutting the spoilboard. The Kent CNC dust foot works very well until it reaches the edge of the work when part of the bristles go beyond the edge. Dust escapes in quantity, so we had to follow up with a hose to get the residual off the floor. Trying to keep it nice and clean, tho it is hard to do sometimes.

    "The best thing about building something new is either you succeed or learn something. Its a win-win situation."

    --Greg Westbrook

  8. #8
    Join Date
    Mar 2006
    Posts
    7,832

    Default

    A shop without dust, is not a shop....it's a storage closet....

Similar Threads

  1. Update shopbot control computer with VCarve Pro Shopbot edition
    By Greybarn in forum ShopBotter Message Board
    Replies: 6
    Last Post: 11-16-2016, 11:55 AM
  2. Fab Lab Camp, Tulsa, OK
    By billp in forum Camp ShopBots/User Groups/Training Classes
    Replies: 5
    Last Post: 04-20-2012, 10:25 AM
  3. FabLab news
    By bill.young in forum ShopBotter Message Board
    Replies: 0
    Last Post: 03-17-2009, 09:06 AM
  4. Replies: 1
    Last Post: 08-22-2008, 05:24 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •