Results 1 to 5 of 5

Thread: Welding on the frame ??

  1. #1
    Join Date
    Dec 2008
    Location
    , Richmond Tx
    Posts
    1,091

    Default Welding on the frame ??

    On a prt that is set up, I am thinking of welding on the table frame. The table is to flimsy that was made for it and needs some bracing to stiffen it up. I know they are capable of plasma cutting, so I wasn't sure how much stuff should be taken off or unpluged. Any advice?
    Ken

  2. #2
    Join Date
    Jan 2004
    Location
    iBILD Solutions - Southern NJ
    Posts
    7,986

    Default

    As long as you put your grounding clamp as close to the area you are welding as possible, everything should be fine. I've welded my PRT's gantry to keep it square, and used to have the SB plasma cutter setup.

    -B

  3. #3
    Join Date
    Dec 2008
    Location
    , Richmond Tx
    Posts
    1,091

    Default

    Ok thanks. I have all the braces cut and ready and am going to start welding now. I went a little overkill I guess. I unplugged EVERYTHING from the control board but left the motors and wiring on the machine.
    Kenneth

  4. #4
    Join Date
    Nov 2003
    Location
    Remembrances, Fayetteville Texas
    Posts
    300

    Default

    Kenneth, I see you are waisting no time with the beefing up of the table since our visit yesterday. Talk to you soon. James

  5. #5
    Join Date
    Dec 2008
    Location
    , Richmond Tx
    Posts
    1,091

    Default

    Thanks for spending the time with me James. I enjoyed the visit and I realized that my table was to flimsy. I spent the day welding and it is solid as a rock now. I even made a platform under the table for the pc and controller. Everything was going so well I went ahead and put an attached console on the side of it for the monitor and keyboard too.

Similar Threads

  1. Another Frame
    By khalid in forum Folder 2014
    Replies: 3
    Last Post: 05-11-2014, 06:42 AM
  2. Welding to the shopbot?
    By drodda in forum Archives2007
    Replies: 6
    Last Post: 01-28-2007, 12:23 AM
  3. Upgrading PRT Frame to Alpha Frame
    By erik_f in forum Archives2005
    Replies: 10
    Last Post: 07-15-2005, 05:54 PM
  4. Welding Shopbot Table
    By jimmythethief in forum Archives 2003
    Replies: 3
    Last Post: 07-30-2003, 03:40 PM
  5. GMAW welding using ShopBot
    By ron_cleaver in forum Archives2003
    Replies: 7
    Last Post: 01-24-2003, 12:54 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •