Results 1 to 6 of 6

Thread: got my 1500.00 chunk of steel from shopbot.

  1. #1
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default got my 1500.00 chunk of steel from shopbot.

    just got this delivered today. now to find the time to install it. I notice no spring in it so it does not lift up if the power is cut? does the stay in place when the machine is powered off?

    Attached Images Attached Images

  2. #2
    Join Date
    Mar 2004
    Location
    Delray Beach, FL
    Posts
    3,708

    Default

    As I recall I moved my existing springs when I upgraded.
    They don't come with it as different spindles/routers take different springs.

  3. #3
    Join Date
    Oct 2009
    Location
    Elgin Illinois
    Posts
    706

    Default

    Wow, that is a beautiful assembly! I assume it is the Z/spindle mount for a PRS. It certainly makes my PRTalpha Z/spindle mounting assembly look like a model T in comparison. Chuck
    Chuck Keysor (circa 1956)
    PRT Alpha 60" x 144" (circa 2004)
    Columbo 5HP spindle
    Aspire 9.0, Rhino 5

  4. #4
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default

    ya I was getting slop in mine after so long and the 2" extra z is really needed. I see how the springs go in now.

  5. #5
    Join Date
    Mar 2009
    Location
    n/a, Vancouver BC
    Posts
    68

    Default

    Nice! Please post some more pics of it and your installation if you can.

  6. #6
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default

    will do I have been too busy and I was too tried today to do it.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •