Hi everyone,
I'm in the process of refurbishing a sign that fell over in a recent storm. The posts appear to have broken at ground level because they were completely rotted. The sign is 1 1/2" thick cedar and is at around 30ish square feet in surface area. Originally it was installed on two 4x4 cedar posts that were boxed in with 1x6 and 1x4 to add detail and appears to be buried 42" below grade (both 4x4 and 1x box). I am wondering if it would be ok to dig new holes (to avoid having to pull the old cement) and plant pressure treated 4x4's without the 1x boxing the required 42" and remount the sign using 4 lag bolts ( it held with 3 for many years.