I am trying to set up my first test cut with the link and I have defined 3 operations in the TWD file . There is the outline , drilling of holes and pocketing of KD/RTA fillings . The outline is obviuos to set up but I am not sure how to ensure their are tools defined to do the other operations . I have a 1/4" bit for outlines and it will be used for the pockets as well and I have an air drill for the drilling operation . I set up a tool for drilling with the correct diamater but it doesn't seem to be recognized . Any tips appreciated ..
Thanks Bill