The good news is that I'm getting out of my garage. The bad news is that I have to move this big piece of equipment. So, I have a PRT96, with a steel table built to ShopBot plans. Is it realistic to think that, if I remove the gantry, that I can move the table with a bunch of manpower (like 8 guys)? (And when I say move, its out of my garage, up a ramp into a trailer - out of the trailer, onto vehicle mover trolleys, and wheeled into place.)
Any other tid bits of knowledge that any of you have about moving a ShopBot would be really appreciated.
Thanks,
Matt