Results 1 to 7 of 7

Thread: My first paid sign

  1. #1
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default My first paid sign

    This is the first sign I was actually paid for well the first two signs. The first pic is what they wanted. They sent me a PDF file and I was able to extract the text and the logo.
    The hardest part was working out the logo. They wanted it easy to painted and different levels. So after some trail and error on some hardboard I got it worked out. So each color is on a separate level and the logo is easy to build the pieces lower have outlines to lineup the pieces that go on top so it is easy to get right. Here is what they are shooting for

    The next pics are of the logo it is about 45” across it is 4 levels of ½” mdo

    The smaller sign is 3’x3’ with the same logo just smaller and the letters are pocketed so they self align.
    well two signs really. spent about 4 hours cutting or a bit less and about 4 to 5 hours with computer work. I cut it all with a 1/8" downcut bit at 3ips in .25" passes. the packed sawdust kept everything in place so I needed no tabs.
    the hardest part was cutting up the scrap to fit in the can (G) I had to redesign a few pieces as they were too fragile.
    sure like how the MDO cuts.

    here is a link to all of the pics since this site ruins them. here is what they are shooting for. they have the old sign up so they will paint it and install it.

    http://s154.photobucket.com/albums/s...toolworks/pnc/

  2. #2
    Join Date
    Jan 2006
    Location
    Asheville NC
    Posts
    106

    Default

    Great Job

  3. #3
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default

    looked and talked to the customers Thursday they brought the wood friday and I cut it all Saturday. have to get some finished pics when they get it painted and up. one of the few jobs where everything went well. could you imagine doing this without a cnc? I can't imagine the guy they usually have do such work how much he bid.

  4. #4
    Join Date
    Nov 2003
    Location
    Remembrances, Fayetteville Texas
    Posts
    300

    Default

    Steve, Very nice job

  5. #5
    Join Date
    May 2006
    Location
    H & H Woodworking, Polkton NC
    Posts
    233

    Default

    Looks good Steve

  6. #6
    Join Date
    Sep 2006
    Location
    cnc routing, portland or
    Posts
    3,633

    Default

    they finally got the parts painted and up here are the pics down on the bottom.
    http://s154.photobucket.com/albums/s...toolworks/pnc/

  7. #7
    Join Date
    Dec 2007
    Location
    , Elmore Vermont
    Posts
    151

    Default

    Really nice Steve.

    Thanks for posting,

    Terry

Similar Threads

  1. Patience has paid off
    By Tom Bachman in forum ShopBotter Message Board
    Replies: 40
    Last Post: 10-13-2016, 11:04 AM
  2. My Bot paid for itself in one project!
    By twelchPTM in forum Folder 2013
    Replies: 12
    Last Post: 04-10-2013, 05:52 PM
  3. First paid project: Street sign
    By coryatjohn in forum ShopBotter Message Board
    Replies: 19
    Last Post: 04-06-2013, 10:45 PM
  4. paid the bills for another day
    By dan_nelson in forum Sign Making
    Replies: 2
    Last Post: 04-05-2012, 09:28 AM
  5. First paid carving
    By carlhopkins in forum ShopBotter Message Board
    Replies: 0
    Last Post: 10-06-2009, 10:20 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •