harryball
02-16-2015, 06:36 PM
Thought I'd share.
Here is what I setup with the shelving I bought that I mentioned in the products forum. The first section in front I already had the uprights and beams for 4 shelves but no decking. I purchased a matching second section (in back) extra beams to make 5 shelves and the wire deck as mine had 2x4's for shelving. It is centered on one of my exterior rollup doors, the intent from the beginning. The rack can be loaded from outside and the scissor cart can be used to help transfer material from the racks directly over to the bot. Heavy stuff toward the bottom, lighter stuff toward the top. Including the floor I get a total of 12 positions. The floor position is 16" and the rest are 12" spacing.
I'm still loading it up, there won't be that much empty space much longer. It sure is nice to have solid storage, it's long over due.
/RB
Here is what I setup with the shelving I bought that I mentioned in the products forum. The first section in front I already had the uprights and beams for 4 shelves but no decking. I purchased a matching second section (in back) extra beams to make 5 shelves and the wire deck as mine had 2x4's for shelving. It is centered on one of my exterior rollup doors, the intent from the beginning. The rack can be loaded from outside and the scissor cart can be used to help transfer material from the racks directly over to the bot. Heavy stuff toward the bottom, lighter stuff toward the top. Including the floor I get a total of 12 positions. The floor position is 16" and the rest are 12" spacing.
I'm still loading it up, there won't be that much empty space much longer. It sure is nice to have solid storage, it's long over due.
/RB