    Default Moving an assembled ShopBot

    Hi all,

    I have a dilemma regarding moving my ShopBot temporarily. I just spoke to the HVAC contractors who will be fixing some ductwork in our shop, and it turns out they need access to the space above the Bot, probably just for a day or so.

    I'm wondering whether anyone has moved a fully assembled ShopBot for a situation like this. I'd prefer to avoid the downtime of fully breaking it down, but I'm worried about the consequences of moving the machine assembled, especially regarding squareness.

    My machine is only a PRSAlpha 48"x48", so that may simplify matters some. I do have a three-phase spindle, so I'm tethered to the wall. I'd probably only need to shift the whole thing a few feet so the contractors can get a Genie lift in beside it.

    Does anyone have technique recommendations for moving an assembled Bot? Would it be OK to use some type of hydraulic lift under an area of the table? Or should I just accept some downtime and use this as an excuse to fix some table/spoilboard issues I've been working around since I first assembled the Bot?

    Any tips would be much appreciated.

    Lewis

  2. #2
    Join Date
    Oct 2005
    Location
    s5mfg.com, Hutchinson Minnesota
    Posts
    336

    Default Moving the bot

    Just buy 4 trailer tong jack's with wheels on them and mount them on the legs , then evenly jack it up and roll it away.

  3. #3
    Join Date
    Feb 2008
    Posts
    210

    Default

    I had my PRT 48x48 on caster wheels all the time and move around a lot with no issues on alignment. I do not have a spindle. I would not want to just lift in the middle. maybe cross bracing under the lower braces and lifting from there.

  4. #4
    Join Date
    Sep 2006
    Location
    Garland Tx
    Posts
    2,334

    Default

    Lewis:

    A technique I used to use when temporarily moving aligned and leveled metal working equipment was to spray paint around the base/feet. Carefully move and then return to the exact spot using the marked locations.

    Steve

  5. #5
    Join Date
    May 2005
    Location
    Londonderry New Hampshire
    Posts
    341

    Default Platform

    How high are your ceilings? Maybe you can build a temporary platform over it or scaffolding...just a thought.
    Dick
    Aspire 10.5

  6. #6
    Join Date
    Nov 2009
    Posts
    727

    Default

    I would still go through everything when you move it back into place including dropping the X motors and checking the X rails for alignment.
    Michael Schwartz - Waitsfield VT
    Shopbot prs standard 48x96. Aspire. SB Link.

  7. #7
    Join Date
    Nov 2007
    Location
    Vankleek Hill, ON
    Posts
    861

    Default

    If there is even sit-up headroom over the bot, I'd consider renting some scaffolding and assemble it right over top of the bot.

    edit: Just noticed that Dick thought of this a fe hours ago :-)

  8. #8
    Join Date
    Dec 2007
    Posts
    2,399

    Default

    I have a bunch of those 3 caster dollys that I used to move mine.I jacked up one end then put a dolly under each leg it then I jacked up the other and put one under each of the other legs. Rolled it right into position and did the reverse.

  9. #9
    Join Date
    Apr 2007
    Location
    Smithers British Columbia
    Posts
    38

    Default

    I have the same setup as Stephan. The jacks have come in handy many times more than the one time I thought I'd use them. I even used this setup to move it from one shop to another.. 4 guys rolled it right onto a tilt deck trailer. I did still check to make sure it was square after moving and it is VERY important to raise all four legs evenly.

  10. #10
    Join Date
    Feb 2010
    Location
    NextFab Studio LLC, Philadelphia PA
    Posts
    20

    Default

    Thanks for all the suggestions. I think the trailer tongue jacks are going to be my best bet- it's a little tight on two sides of my Bot, so I doubt I'd be able to get scaffolding in behind it.

    It looks like the tongue jacks are designed to grip a horizontal bar- Frank and Stephan, did you drill mounting holes in the legs to attach them? Other than that they seem pretty straightforward.

Similar Threads

  1. New unit assembled and running but have a few questions
    By ajf in forum Assembly & Maintenance
    Replies: 5
    Last Post: 05-18-2010, 12:49 PM
  2. Moving my shopbot?
    By gundog in forum Archives2008
    Replies: 4
    Last Post: 04-27-2008, 08:39 AM
  3. Moving a shopbot
    By gerard in forum Archives2007
    Replies: 2
    Last Post: 11-25-2007, 07:03 PM
  4. Moving Shopbot
    By stephen in forum Archives2007
    Replies: 6
    Last Post: 04-02-2007, 08:49 AM
  5. Assembled and running
    By mnaughton in forum ShopBot in Schools
    Replies: 8
    Last Post: 02-25-2007, 09:35 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •