Sounds good. I am pretty excited.
I am going to work on my plenum, and spoil board later this week. I have acquired all of the plumbing.
I bought a 12x24x24 NEMA type 1 enclosure, along with a pair of louvered vents. I am going to mount my motors inside of this enclosure, and mill some flanges from 1.25" thick type 1 pvc to mount to the outside. I got a pair of pvc swing check valves. I should have the rest of the materials for this on monday.
Michael Schwartz - Waitsfield VT
Shopbot prs standard 48x96. Aspire. SB Link.