I am getting ready to finish the inside shell of my 16 x 24 wood shop. I have been searching the forum looking for power requirements and grounding for the ShopBot. Can I get some suggestions as to how many and what kinds of power I should pre wire for now that the walls are still open. I liked the idea of the individual blower vacuum motors mounted under the table for hold down and want to plan wiring for that too. I just finished a 14 x 6 foot addition on the back of the wood shop for dust collection equipment. I have a 200 amp service in the Laser Engraver shop with a 100 amp sub panel in the wood shop. No 3 phase in my area. I am a one man shop and have installed current monitors on the main power panel to keep an eye on my Amps. I am about a year away from buying a ShopBot, I am not sure if it will be a spindle or router. I ran CAT5, CCTV and E Stop wires between the side by side laser shop and the wood shop as I will share time between the buildings. I liked the suggestion to run a stripped down computer for the ShopBot, customizing the operating system at install. How about Earth Grounding the ShopBot? I didn't search that but I wonder about ground loop? If I ran copper back to my main service ground rod that might work... About 40 feet. Trying to get it right the first time.