    I am getting ready to finish the inside shell of my 16 x 24 wood shop. I have been searching the forum looking for power requirements and grounding for the ShopBot. Can I get some suggestions as to how many and what kinds of power I should pre wire for now that the walls are still open. I liked the idea of the individual blower vacuum motors mounted under the table for hold down and want to plan wiring for that too. I just finished a 14 x 6 foot addition on the back of the wood shop for dust collection equipment. I have a 200 amp service in the Laser Engraver shop with a 100 amp sub panel in the wood shop. No 3 phase in my area. I am a one man shop and have installed current monitors on the main power panel to keep an eye on my Amps. I am about a year away from buying a ShopBot, I am not sure if it will be a spindle or router. I ran CAT5, CCTV and E Stop wires between the side by side laser shop and the wood shop as I will share time between the buildings. I liked the suggestion to run a stripped down computer for the ShopBot, customizing the operating system at install. How about Earth Grounding the ShopBot? I didn't search that but I wonder about ground loop? If I ran copper back to my main service ground rod that might work... About 40 feet. Trying to get it right the first time.

  2. #2
    Join Date
    Sep 2004
    Location
    The Traditional Rocking Horse Co.,
    Posts
    1,164

    Default

    Albert
    Start herefor grounding,and then look at this as a start for your power needs.
    After reading these, come back if you have more specific questions.

    ..........Mike

  3. #3
    Join Date
    Sep 2004
    Location
    Sticks and Stones, Hood River Oregon
    Posts
    103

    Default

    Now is a good time to think about how many circuits you should use. I recently did electric on my new shop, and installed these circuits;

    1) 20 amp for controller/computer (with battery backup, incidently)
    2) 20 amp dedicated for router
    3) 220V 20 amp for dust collector

    The controller is on a dedicated cirucit- that is nothing else gets plugged into that circuit- so that a failure of some other tool or machine won't cause a breaker to trip while the SHopbot is running. Same thing for the router- its the only thing on the circuit.

    This is working very well so far. Others will add to this, no doubt. Wire what you need now- its way easier than retrofitting.

    Wayne from White Salmon

  4. #4
    Join Date
    Jan 2006
    Location
    CNC Craftsman LLC, Prescott AZ
    Posts
    22

    Default

    After a year of owning my ShopBot, I moved into a new 16 x 22' shop. I had a 220v installed in the ceiling above the ShopBot and one on the wall for the dust collector. When I dropped the 220v to a seperate breaker box on the ShopBot, and from this I also wired a 220v extra outlet and a 110v duplex outlet mounted on the table's XY leg. This allowed an additional shop location for 220v, and a 110v outlet for the router.

    In addition, I put split duplex 110v outlets on the walls in convenient locations. The outlets are split between 2 breakers, so I will never overload any single set of outlets with many tools connected

    I have never had a grounding problem without using a special earth ground.

    Tim

  5. #5
    Join Date
    Nov 2005
    Location
    Pocono Digital Woodshop, Shohola PA
    Posts
    8

    Default

    Mike, Wayne, and Tim,
    Thank You for your reply's. Some great reading in the "check here", Thanks!!!. I read the forum about once a day had have been for months. I especially like the troubleshooting as I am a retired Navy Technician and worked for Sony for 8 years in everything from making picture tubes, keeping the line running in San Diego to Fixing Play Stations in Philly. We had a lot of Fanuc robots, Servo and Stepper equipment in San Diego.

Similar Threads

  1. Power Requirements
    By dewey_dog in forum ShopBotter Message Board
    Replies: 2
    Last Post: 03-08-2016, 06:25 PM
  2. Shop setup
    By Kyle Stapleton in forum ShopBotter Message Board
    Replies: 9
    Last Post: 12-17-2013, 08:52 PM
  3. Spindle Power Requirements Needed
    By kenz in forum ShopBotter Message Board
    Replies: 6
    Last Post: 11-10-2010, 09:03 PM
  4. My new shop setup
    By GlenP in forum ShopBotter Message Board
    Replies: 16
    Last Post: 03-04-2010, 12:14 AM
  5. Two Fein T3 Power Requirements
    By bill_lumley in forum Archives2007
    Replies: 3
    Last Post: 06-16-2007, 09:15 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •