Collars glued in, motor mounted and bolted to the stand.

Photo-2015-03-29-13-29-28_1736.jpg

Photo-2015-03-29-13-29-32_1737.jpg

After it was bolted to the end of the stand I just had to run the 2" pvc to all of my zones. As I said before there are gate valves up under the table right behind the vac box back plate. They are out of the way, which is nice but you have to get down on your knees to operate them, so I might try and automate them with some actuators at some point, but for now they do the job.

I didn't take any pics of the under the table plumbing, but that's pretty standard. I used 2" PVC and the long curve 45 degree turns then used some toilet flange to connect to the table plenum.

Plumbing done, lid on. From some angles it looks like the box sticks out past the end of my table, but its actually flush.